We did additions and alterations (A&A) for 9 Nos of column, finished with #8 high polish stainless steel column,  located outside Tung Centre. It comes with 2 nos. of 150 (W) x 4500 (H) vertical light box at both side of the columns, finished with 3 modules of mirror polish cladding with a 10mm horizontal groove each.

Architect:Designphase Pte Ltd
Main Contractor(s):Hup Yew Sen Construction Pte Ltd
Location:20 Collyer Quay,
S049321
Date of Completion:Dec 2008

Scope Of Work

Designed, supplied & installed:

  • Column claddings
  • Light boxes