To cater for more cruise passenger arriving, Marina Bay Cruise Centre was build.

A special design of trolley guard was used to allow for top rail to be removed promptly, considering the ease of future maintenance and replacement.

A total of 123 sets of demountable stainless steel rail with rapid release pin lock was installed by us.

Architect:RSP Architects Planners &
Engineers Pte Ltd
Main Contractor(s):Sato Kogyo (S) Pte Ltd
Location:61 Marina Coastal Drive,
S018947
Date of Completion:Jan 2012

Scope Of Work

Designed, supplied & installed:

  • Railings
  • Trolley guard rails
  • Glass railings
  • Fencings for guard house & entrance gate